BG BRG GMÜND

Refurbishment and extension
Bundesgymnasium (state high school)
Competition | Realised | 2014

Refurbishment and extension seen as an opportunity! The spaces required for a differentiated way of teaching are created here, spatial structures for learning groups, group rooms, work, play and movement rooms are grouped around a central multi-storey hall. The minimal nature of the intervention in the spatial structure is of design relevance in adapting the existing building. The north wing is extended in the direction of the school yard (east). An internal restructuring is carried out only where the programme of spaces and functions make it seem absolutely necessary. The individual measures: - Extending the administration by moving the library to above the entrance area. - The music rooms are combined and, together with the collection, are moved to the wing that connects to the gyms. - The computer studies rooms in the basement are combined and, along with the workshops, are directly connected to the hall by an additional linking corridor


3950 Gmünd, Gymnasiumstrasse 5
BIG Bundesimmobiliengesellschaft m.b.H.

Fotos © www.erlacher.co.at